Howdy,
I'm with Brian on the house stuff...
Nearly done re-wiring the attached garage that will be the temporary workshop until we get the real workshop built (a year or two out most likely). After that, there's insulation, some carpentry/plumbing work to get a sink in there and a gas line for the heater, busting up the existing (too low & horribly cracked) floor and repouring a new one, raising the garage doors to account for the new floor height, drywall, installing a heater, then whatever bench/shelf building is needed.
When I write all that out though, I mostly just want to take a nap instead. :-)
Mark
|