QUOTE (rmackintosh @ Oct 23 2004, 10:38 PM)
...just started today to "finish" the bathroom remodel I started LAST winter...

...ok....OK....
AFTER I finish the bathroom remodel....
1. Rip entire front off the car (fenders, hood, nose) and cut EVERYTHING possible off the car.
a. Hang oil cooler in headlight bucket
b. Install small tubing nose supports off of the roll tube bumper
c. Install simpler radiator ducting/box
d. New VFN hood
2. Cut off "extra" cowl below windshield....for weight and improved heat exhaust from engine compartment
a. Install roll cage to front shock tower bars and triangulate if possible
3. Re-do rear suspension
a. Install UE PHB relocationkit
b. Install All Star adjustable collar and race springs (400 lbs)
c. Install new LGM torque arm
d. Relocate rear trailing arms to "proper" angle
4. Re-do front suspension
a. Install new LGM lower control arms
b. Install new Bilstein coilovers
c. Fabricate coilover mounting system
5. Install new Moroso Twister mufflers...looking for a louder muffler that will pass sound!
Anything else I can get done at the fabricators shop while I have his attention!