![]() |
|
![]() |
![]()
Post
#1
|
|
Experienced Member ![]() ![]() ![]() Group: Advanced Members Posts: 1,936 Joined: 26-September 05 From: Youngstown, OH Member No.: 896 ![]() |
|
|
|
![]() |
![]()
Post
#2
|
|
Experienced Member ![]() ![]() ![]() Group: Advanced Members Posts: 1,936 Joined: 26-September 05 From: Youngstown, OH Member No.: 896 ![]() |
Howdy,
Well, the baby is due in late Jan. :-) I'm not really sure if I'll be 'done' by then or not... I'd like to have the floor done, front wall resided, garage door installed, plumbing (gas line for heater and sink installed) done, ceiling insulated / sheet rocked, walls sheet rocked, and floor painted/sealed before the baby gets here. That's probably unrealistic, but its the goal. If that's done, I can move the tools into the middle of the garage until after I get benches/shelves built, heater installed, lighting installed, etc. The stuff that's supposed to be in the garage is currently in our enclosed trailer, florida room, guest room (which we call the "lathe room"), and living room. Its all been there for over a year though, so we're pretty used to it. Doesn't everyone have 20' sticks of steel material in their living room? :-) The baby's room can actually have the current exercise equipment moved out and redistributed around the house before the garage is finished, but it'll certainly have the house looking a little weird for while... Nothing like a dining room with a weight bench... :-) Mark This post has been edited by marka: Dec 6 2006, 05:36 PM |
|
|
![]() ![]() |
Lo-Fi Version | Time is now: 23rd May 2025 - 08:45 AM |